Add-On Service
CONCRETE PADS
Pads for battery systems too heavy to wall-mount. Like the concrete pad under an AC unit—level, stable, built to last.
LEVEL & STABLE
★ BATTERY PADS ★ INVERTER PADS ★ LEVEL & STABLE ★ PROPER DRAINAGE ★ DFW & HOUSTON ★ BATTERY PADS ★ INVERTER PADS ★ LEVEL & STABLE ★ PROPER DRAINAGE ★ DFW & HOUSTON
WHAT'S INCLUDED
WHEN YOU NEED THIS
Not every battery system needs a pad. Here's when to call us:
- Heavy battery systems — too heavy for wall mounting or existing surfaces
- Multiple battery units — stacked systems that need a solid, level base
- Ground-mounted inverters — when wall mounting isn't an option
- Commercial installations — larger equipment requiring engineered pads
Same idea as an AC condenser pad. The equipment needs a stable, level surface that won't shift or settle. We pour it right so you don't have problems later.
OUR PROCESS
1
You send equipment specs
Battery model, dimensions, weight, anchor pattern. We size the pad accordingly.
2
We prep and form
Excavate, compact base, set forms. Proper slope for drainage.
3
Pour, finish, set anchors
Concrete placed, finished smooth, anchor bolts set to your specs.
4
Cure, then you install
After proper cure time, your crew mounts the equipment. Solid foundation, no shifting.